Leave Your Message

Q345 Hot Rolled Carbon Seamless Steel Pipe Factory Direct Sales 10# 20# 35# 45#

The production process of seamless carbon steel pipes involves several key steps to ensure high-quality and efficient manufacturing. Here's an overview of the production process in English:
Material Selection: The process begins with the selection of high-quality carbon steel billets or ingots. These raw materials undergo thorough inspection to ensure they meet the required chemical composition and mechanical properties.
Heating: The selected billets or ingots are heated to the proper forging temperature in a furnace. Heating is crucial to facilitate plastic deformation and ensure uniformity throughout the material.
Piercing: Once heated to the appropriate temperature, the billets or ingots are pierced by a piercing machine to form a hollow shell. This piercing process creates the initial shape of the seamless pipe.

    Description

    The production process of seamless carbon steel pipes involves several critical steps to achieve high-quality, seamless tubes suitable for various industrial applications. Here's a detailed overview of the typical manufacturing process:
    Raw Material Selection: The process begins with selecting high-quality raw materials, typically carbon steel billets or solid round steel bars. These materials are chosen based on their chemical composition, mechanical properties, and suitability for seamless pipe production.
    Heating: The selected raw material undergoes heating in a rotary hearth furnace or induction furnace to reach a uniform forging temperature. Heating is crucial to facilitate plastic deformation and subsequent forming processes.
    Piercing: The heated billet or round bar is pierced at the center with a mandrel mill or a piercing machine. This process creates a hollow shell called a "bloom" or "billet" with a thick wall.
    Rolling: The pierced bloom or billet is then rolled and stretched over a mandrel on a continuous rolling mill. This process reduces the wall thickness and increases the length of the hollow shell. As it passes through several sets of rolls, the outer diameter and wall thickness are gradually reduced to achieve the desired dimensions.
    Annealing: After rolling, the seamless pipe undergoes heat treatment known as annealing. This process involves heating the pipe to a specific temperature and holding it for a period to relieve internal stresses and ensure uniform mechanical properties throughout the pipe.
    Sizing: The annealed pipe is passed through a series of sizing rolls to achieve the final dimensions and improve surface finish. Sizing also ensures the accuracy of the outer diameter and wall thickness according to the specified tolerances.
    Straightening: If necessary, the pipe undergoes straightening to correct any bending or distortion caused during the manufacturing process. Straightening ensures the pipe meets the required straightness criteria.
    Testing and Inspection: Throughout the production.

    Industry-Specific Attributes

    Section Shape Round
    Surface Treatment Hot Rolled
    Tolerance ±1%
    Oiled or Non-oiled Non-oiled
    Invoicing by theoretical weight

    Other Attributes

    Place of Origin Shanxi, China
    Alloy Or Not Is Alloy
    Standard ASTM,AISI,BS,DIN,GB,JIS
    Grade Q235A, Q235B, Q345, L245, L290
    Delivery Time 8-14 days
    Brand Name XINBAODA
    Application Fluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, OIL PIPE, Chemical Fertilizer Pipe, Structure Pipe
    Special Pipe API Pipe
    Thickness 2.11mm~300mm, 2.11mm~300mm
    Length 12M, 6m, 6.4M
    Certificate ISO9001
    Processing Service Bending,Welding,Decoiling,Punching, Cutting
    Product name Seamless Steel Pipe
    Standard ASTM,AISI,BS,DIN,GB,JIS
    Shape Round.Square. Rectangular
    Length customers' actual request
    Material Q235A, Q235B, Q345, L245, L290,10#, 20#, 45#
    Surface Treatment painted,galvanized,or oiled according to customer's requirement
    Technical Methods Hot-rolled/Cold-drawn/Hot-expanded
    Delivery time 8-14 days
    Advantage Strong Corrosion Resistance
    Packing STANDARD PACKING

    Packaging and Delivery

    Packaging Details Anti-water paper+steel strips.
    Port Qingdao Tinajin or Shanghai
    Selling Units: Single item

    Supply Ability

    Supply Ability 100000 Ton/Tons per Month

    Product Display

    detail Seamless Steel Pipe (3)06r
    detail Seamless Steel Pipe (4)9jv
    detail Seamless Steel Pipe (6)5uo
    detail Seamless Steel Pipe (7)xke
    detail Seamless Steel Pipe (8)121
    detail Seamless Steel Pipe (9)9qx

    Leave Your Message